PRIME DRAFT ESTIMATES /Fireproofing Estimating Services

Fireproofing Estimating Services

A fireproofing bid can look profitable until drawings reveal different steel profiles, fire ratings, and an exposed ceiling needing another finish. Prime Draft Estimates provides fireproofing estimating services that turn these details into measured quantities, material allowances, and organized costs before you commit to a price.

We help subcontractors and general contractors price sprayed fire-resistive materials, intumescent coatings, boards, and related passive fire protection. You receive a takeoff built around the specified assemblies, not a guess based on total floor area. Send your drawings and bid deadline to request a free project quote.

The Costly Difference Between Floor Area and Fireproofing Scope

A building might contain 40,000 square feet of floor space, but that number does not tell you how much fireproofing it needs. Beams, columns, bracing, deck profiles, and exposed connections require different measurements. Some members need protection on three faces; others have four exposed sides. Thickness also changes with the tested assembly and required rating.

Area-based budgets can miss spray material, finish coats, access equipment, or congested mechanical systems. Our fireproofing quantity takeoff separates these conditions, so your team can check its coverage, request missing details, and make deliberate pricing decisions.

Why Choose Prime Draft Estimates for Fireproofing Estimating Services?

Prime Draft Estimates makes fireproofing bids easier to review, revise, and explain. We work from your construction documents, distinguish measured quantities from assumptions, and organize costs around the protection systems your project specifies. A second team member checks estimating work, with a senior estimator reviewing the final package before delivery. You can receive an Excel breakdown, supporting PDF summary, and drawing references according to your agreed scope. If your team already uses its own cost codes or bid template, we can work within that format. We also offer confidential outsourced support for contractors handling several bids at once. Serving projects across all 50 U.S. states, we account for project location without claiming that one code or price applies everywhere.

Fireproofing Systems and Material Takeoffs

Sprayed Fire Resistive Materials and Cementitious Fireproofing

For sprayed fire resistive materials, including MONOKOTE systems, we measure beams, columns, joists, and floor or roof decks according to their protected surfaces. Takeoffs distinguish member profiles, required thickness, density, and coverage requirements. We also account for fluted decks, substrate preparation, bonding agents, masking, overspray protection, patching, equipment setup, and cleanup where included. Product yield and application loss are assessed separately, helping you avoid understated material quantities and overlooked labor.

Intumescent Fireproofing for Visible Steel

Intumescent fireproofing for visible steel requires careful attention to member geometry and appearance requirements. We measure exposed surfaces and review the specified product, fire rating, steel section factor, and required dry film thickness. Estimates also consider primer compatibility, surface preparation, multiple coating applications, curing time, and approved topcoats. Exposed and concealed steel are recorded separately, while missing coating schedules or listing details are flagged before they become costly bidding assumptions.

Fire-Rated Boards and Protective Wraps

Fire-rated board and protective wrap estimates begin with the approved assembly, not just its outside dimensions. We quantify board area, thickness, number of layers, fasteners, support framing, joints, and cutting allowances where specified. For protective wraps, we review required overlaps, corners, penetrations, and attachment methods. This separation helps contractors price installation labor and materials realistically, especially where complex enclosures or restricted access increase waste, handling time, and installation effort.

Firestopping and Penetration Protection

Fireproofing protects structural members and rated assemblies, while firestopping maintains resistance at penetrations and joints. When both appear in your scope, we measure them separately to prevent duplicated pricing. Firestopping takeoffs can include penetration counts, joint lengths, sealants, collars, mineral wool, and specified system accessories. We also flag responsibilities shared with mechanical, electrical, and other trades, helping your team clarify exclusions early and avoid missing essential work before bid submission.

How a Reliable Fireproofing Quantity Takeoff Is Built

We compare architectural life safety plans, structural framing plans, schedules, fire resistance details, specifications, and issued addenda. Digital measurements are prepared using appropriate tools such as Bluebeam Revu and PlanSwift. Each condition receives appropriate measurement units and drawing references.

For example, a 40-foot beam with 2.5 feet of exposed perimeter begins with 100 square feet of surface to coat. That is not the purchase quantity. The approved design, actual profile, required thickness, product yield, and application losses still need to be considered. This prevents a beam count from becoming a misleading material order.

We organize takeoffs under CSI MasterFormat Division 07, including 07 81 00 Applied Fireproofing, 07 81 16 Cementitious Fireproofing, 07 81 23 Intumescent Fire Protection, and 07 82 00 Board Fireproofing where applicable. Firestopping belongs under 07 84 00 and is identified separately.

Before Your Bid Closes, Resolve These Scope Gaps

Some of the most expensive omissions are not obvious on a floor plan. Our review draws attention to questions that should be resolved before pricing:

  • Who Protects the Concealed Steel? Structural and architectural sheets sometimes show different limits for spray application.
  • Who Pays for Damaged Coating Repairs? Later installation of ducts, hangers, and cable trays may create patching work.
  • Is the Substrate Ready? Primed steel, concrete, and previously coated surfaces can require preparation or approved bonding treatments.
  • What Access is Available? Occupied renovations, elevated decks, restricted staging, and phased construction change labor and equipment needs.
  • Which Trade owns the Penetration Seals? Firestopping should appear once in the appropriate subcontractor scope.

Unanswered items become assumptions, exclusions, allowances, or design questions. That record protects your ability to compare subcontractor quotations fairly and price addenda without rebuilding the entire estimate.

Fireproofing Codes, Permits, and Inspections

Fire Resistance Codes

Fireproofing requirements follow the locally adopted International Building Code (IBC), including applicable amendments. Chapter 7 addresses rated structural members and assemblies. ASTM E119 and UL 263 establish fire testing methods, while the approved listed design determines required protection. Estimates should reflect that specified design rather than assume uniform coating thicknesses.

Special Inspections

Where the 2024 IBC is adopted, Section 1705.15 covers inspections of sprayed fire-resistive materials, including thickness, density, bond strength, and substrate conditions. Section 1705.16 addresses intumescent materials, referencing AWCI 12-B. Section 1705.18 may apply to specified firestop systems. Inspection costs depend on contractual responsibility and the project’s inspection scope.

Permits and Submittals

New construction generally requires a building permit, while work altering rated assemblies may require an alteration permit. Authorities may also request fire protection submittals, a statement of special inspections, and inspection reports. Exact permit categories, adopted code editions, and approval procedures must be confirmed with the local authority having jurisdiction.

Your Estimate Should Be Usable by the People Reviewing It

A takeoff that cannot be checked is difficult to defend. Depending on the agreed scope, our deliverables include an Excel quantity schedule, a cost breakdown for materials, labor, and equipment, a PDF summary, and marked plans or drawing references. We separate direct quantities from waste and purchasing factors and identify allowances, exclusions, and outstanding design questions.

You can request measured quantities only if your team prefers to apply its own production rates and supplier quotes. For a full fireproofing cost estimate, we use suitable cost references such as RSMeans and available regional market information, adjusted for the project ZIP code and work conditions. Final supplier commitments and bid markups remain with your company.

What Affects Fireproofing Estimating Cost and Turnaround?

The fee for our estimating service depends on drawing completeness, building size, variety of rated assemblies, number of bid alternates, and the requested level of detail. A single system on a straightforward structure is different from a renovation combining SFRM, intumescent coatings, and extensive firestopping.

For a defined single trade quantity takeoff, the typical delivery window is one to two business days after scope approval, subject to capacity and file quality. Complex commercial pricing assignments may take longer. We confirm the fee, deliverables, and realistic delivery date before work starts, so an urgent bid does not become an open-ended commitment.

10 / LET’S REVIEW YOUR PROJECT

Get a Quote While There Is Still Time to Clarify the Drawings

Upload your architectural and structural plans, fireproofing specifications, fire rating schedules, addenda, project ZIP code, and bid date. If the listed assembly or material is missing, send what you have and identify what remains undecided. We review the requested scope and generally provide a free service quote within 24 hours once enough information is available.

Upload Your Plans for a Free Quote or call +1 (442) 291-1994. You can also send documents to info@primedraftestimates.com.

PDF, JPG, PNG or TIFF. For larger drawings and CAD/BIM files, use the shared file link.

Frequently Asked Questions

Yes. Preliminary budgets can use available framing information and stated assumptions. We identify quantities that remain uncertain and revise the scope when approved fire ratings, member schedules, or product selections become available.

They can when requested and supported by the specifications and contract. We identify inspection-related allowances separately, because the owner, contractor, or independent agency may be responsible for different portions of the process.

Yes. Share the specified product, listing details, and coverage data where available. A named material such as MONOKOTE does not replace a tested assembly or establish universal application thickness.

No. Labor access, freight, prevailing wage obligations, supplier availability, site conditions, and equipment mobilization can change the cost. Project ZIP code and available local quotations help shape the pricing assumptions.

gET sTARTED

Fill out the form below, and we will be in touch shortly.
Contact Information
Vehicle Information
Preferred Date and Time Selection