Construction Project Management Services

Prime Draft Estimates provides construction project management and scheduling support to help you plan work, monitor progress, and evaluate risks before they become bigger problems. Our focus is preconstruction coordination, project controls, and documented schedule analysis. We help owners, contractors, and project teams understand dates, dependencies, and outstanding decisions while contractual and on-site responsibilities stay with your appointed team.

Project Management Services Built Around Your Schedule

A useful schedule does more than list start and finish dates. It connects design decisions, approvals, procurement, available resources, and construction activities in the order they must happen. Support covers schedule development, updates, delay reviews, and reporting within the agreed scope.

Primavera Scheduling (P6)

For projects that require Primavera P6 scheduling, we can scope schedule development and review around a work breakdown structure, activity durations, calendars, milestones, and logical relationships. A baseline gives you a reference for measuring changes and updating forecast completion dates. Request an existing schedule review or a new schedule based on project information. P6 file access, output formats, and software availability are confirmed before work begins.

Resource Allocation and Leveling

A schedule may look achievable until two activities require the same crew or equipment at the same time. Resource allocation identifies the labor, equipment, or other capacity assigned to planned activities. Resource leveling evaluates those assignments against actual availability and adjusts activity timing where necessary. We review resource conflicts and schedule trade-offs so you can compare alternatives. Leveling can move activities and extend the completion date; it does not create additional labor or eliminate procurement shortages.

Critical Path Method (CPM)

Critical Path Method (CPM) scheduling identifies the sequence of dependent activities that drives the calculated project completion date. By reviewing logic ties, durations, constraints, calendars, and available float, we help identify which activities need closer attention. If a permit review, structural package, or equipment approval affects the longest path, a delay may push later milestones. CPM analysis gives you a reasoned basis for prioritizing responses and considering recovery options. The critical path can change as work progresses, so it needs periodic review rather than a single calculation.

Time Impact Analysis (TIA)

How might a late design change affect the finish date? Time Impact Analysis (TIA) evaluates a defined event by inserting its modeled activities and relationships into an appropriate schedule update, then comparing the calculated result. The analysis relies on reliable schedule logic, a defensible date, and supporting event records. We can help organize the information and assess the modeled schedule effect within the agreed assignment. TIA does not automatically establish contractual entitlement to extra time or compensation; those decisions depend on the contract and project evidence.

Performance Measurement

When a report says the project is 60% complete, you should know what that figure measures. Performance measurement compares planned activity or cost values with verified progress, using the baseline and reporting rules agreed for the project. Depending on available records, reporting may include milestone variance, quantities completed, planned versus actual costs, and earned value indicators such as Schedule Performance Index (SPI) and Cost Performance Index (CPI). These measures can reveal trends, but they are only as dependable as the underlying progress and cost data.

Progress Tracking

Construction progress tracking turns site reports, design updates, and procurement information into an understandable picture of current status. We review reported actual start and finish dates, remaining durations, percent complete, unresolved RFIs, and procurement milestones against the approved schedule. Reports identify overdue activities, new dependencies, and changes to the forecast completion date. When progress information is incomplete or unverified, we note that limitation rather than presenting an assumed completion percentage as confirmed field progress.

Scheduling Window Delay Analysis

Some delays cannot be understood from the current schedule alone. Scheduling window delay analysis divides a past project period into defined windows, often between available schedule updates, to examine how the driving path and forecast completion changed over time. This retrospective analysis compares contemporaneous updates with supporting records to identify when delays emerged and whether different events affected the schedule during each period. Its reliability depends on preserved schedules, recorded progress, and consistent logic. Findings support review and discussion; they do not, by themselves, determine fault or settle a claim.

Risk Management Analysis

The strongest project plan makes uncertainty visible. Construction risk management analysis identifies potential problems such as incomplete drawings, permit review durations, long lead materials, resource shortages, and unrealistic schedule assumptions. We can help maintain a risk register that records each concern, its potential schedule or cost effect, the responsible party, and a proposed response. Where data supports it, schedule risk analysis may compare duration scenarios. This helps you decide where contingency, earlier decisions, or alternative sequencing deserve attention.

Integrated Project Planning and Coordination

Schedules depend on information arriving when it is needed. Alongside the eight project controls services, Prime Draft Estimates can coordinate drawing review issues, RFI and submittal logs, subcontractor procurement milestones, and budget reporting within an agreed preconstruction scope. Architectural, structural, or MEP revisions can be linked to affected estimates. Budget reviews can identify allowances, changes, and pricing assumptions, while procurement tracking highlights unanswered bid questions or equipment lead times. You gain a consistent record without replacing licensed designers or contractors.

CLEAR, REVIEWABLE OUTPUTS

Project Documentation and Reporting Deliverables

Deliverables depend on your project stage and selected services. They may include a baseline schedule, P6 or PDF schedule outputs, critical path commentary, resource review, progress dashboard, TIA or delay analysis narrative, risk register, and open action log. Data sources, dates, formats, and responsibilities are agreed before production.

You receive findings in a form your team can examine: which activities are affected, what assumptions were used, and which decisions remain outstanding.

ILLUSTRATIVE DELIVERABLE LAYOUT

Project controls

DOCUMENTATION / REVIEW / DECISIONS

Baseline schedule
Critical path commentary
Resource review
Risk register

Illustrative only. Actual outputs depend on the agreed scope.

Technical Standards and Construction Project Compliance

Scheduling methods can draw on the GAO Schedule Assessment Guide and relevant AACE International recommended practices when applicable to the analysis. These are technical references, not claims of accreditation or guaranteed claim acceptance. For each project, we consider the authority having jurisdiction (AHJ), locally adopted International Building Code (IBC) or International Residential Code (IRC) provisions where relevant, permit review requirements, working calendars, and project ZIP code cost factors. Local amendments and material availability may affect planning. We support digital projects across all 50 U.S. states without assuming that one code edition or schedule applies everywhere.

How Our Project Scheduling Services Work

01

1. Send Available Files

Share drawings, specifications, your current schedule or P6 export, project ZIP code, deadlines, and progress records so we can assess project requirements.

02

2. Define the Question

Tell us whether you need baseline scheduling, resource leveling, progress tracking, time impact analysis, or a review of documented historical project delays.

03

3. Approve the scope

We review your files and generally provide a quote within 24 hours of receiving sufficient information, outlining deliverables, fees, timelines, and limitations.

04

4. Review the Results

Receive agreed scheduling reports and analysis, review clearly documented assumptions or outstanding issues, and request clarifications within the approved contractual revision terms.

How Our Project Scheduling Services Work

Scheduling methods can draw on the GAO Schedule Assessment Guide and relevant AACE International recommended practices when applicable to the analysis. These are technical references, not claims of accreditation or guaranteed claim acceptance. For each project, we consider the authority having jurisdiction (AHJ), locally adopted International Building Code (IBC) or International Residential Code (IRC) provisions where relevant, permit review requirements, working calendars, and project ZIP code cost factors. Local amendments and material availability may affect planning. We support digital projects across all 50 U.S. states without assuming that one code edition or schedule applies everywhere.

Frequently Asked Questions

Yes, when adequate schedule updates and supporting records are available. The appropriate method depends on whether you need a forecast of an event’s impact or a review of delays that have already occurred.

CPM is a scheduling method used to calculate activity dependencies and driving paths. Primavera P6 is software that can build, maintain, and analyze CPM based project schedules.

Fees depend on project size, schedule complexity, document quality, reporting frequency, and the type of analysis requested. We quote the defined scope before starting.

We typically need construction drawings, specifications, existing schedules, project deadlines, and relevant progress records. Additional documents may be requested depending on the scheduling analysis required.

Yes. We use Critical Path Method (CPM), Time Impact Analysis (TIA), and scheduling window delay analysis to evaluate delays, identify affected activities, and assess potential schedule impacts.